Similar Posts
Space Crystals
BycorieRecently, Marc helped a user run some crystals which the user had arranged to have grown in zero-gravity. Here are pictures of the crystal capillaries mounted at the beamline, and the raster grid used to locate crystals within a capillary.
Pin base warmer is coming along…
BycorieAnthony installed the first pin base warmer on 5.0.2 today. We have to wait until the ALS has LN restored before we can test it. One thing to note: the people we spoke to at NE-CAT about their pin base warmer told us that it does not actually solve the icing issue completely. They still do see pins move on the goniometer after mounting. Hopefully the warmer will help a bit, though!

Back up and running
BycorieWe are back up from the long ALS shutdown, and the beamlines are in good shape. We completed a number of projects on the sector 5 beamlines, in particular, as well as performed maintenance on a number of systems: – Pilatus3 6M installed on 5.0.1. The install went well, and tests with x-rays show that…
BCSB represented at the ACA in New Orleans
BycorieOnce again, the BCSB teamed up with several other groups at the ALS to host a booth at the ACA. It was great to hang out with our ALS colleagues and to see many of our users.


