Pilatus 6M now installed in 501

The next test is to run the 501 and 502 Pilatus detectors simultaneously off the same PPU.

Pilatus_in_501

Similar Posts

  • Back up and running

    We are back up from the long ALS shutdown, and the beamlines are in good shape. We completed a number of projects on the sector 5 beamlines, in particular, as well as performed maintenance on a number of systems: – Pilatus3 6M installed on 5.0.1. The install went well, and tests with x-rays show that…

  • Space Crystals

    Recently, Marc helped a user run some crystals which the user had arranged to have grown in zero-gravity. Here are pictures of the crystal capillaries mounted at the beamline, and the raster grid used to locate crystals within a capillary.

  • Welcome to Daniil!

    We are very pleased to now have Daniil Prigozhin in the BCSB. He comes to us with a strong background in crystallography, both growing crystals and solving structures. He completed his PhD work with Dr. Tom Alber at UC Berkeley in 2014, then did a post-doc with Dr. Yorgo Modis at the University of Cambridge,…

  • BCSB User Forum

    The BCSB is planning on starting a monthly User Forum to solicit feedback from users on the current and future use of the beamlines. We’d love to hear from you about the direction that the BCSB should be taking in terms of beamline upgrades, features, and general operations. If you are interested in participating in the forum, please contact Corie Ralston.