Pilatus 6M now installed in 501

On March 7, 2017, Posted by , In Operations, With Comments Off on Pilatus 6M now installed in 501

The next test is to run the 501 and 502 Pilatus detectors simultaneously off the same PPU.

Pilatus_in_501

Thank you for reading!

Comments are closed.
0