Similar Posts
First User Forum Feb 5
BycorieThe BCSB had its first User Forum meeting on Feb 5. We discussed the possibilities for the new b3 software interface, showed some screenshots of new the new interface, and gathered information from our users on what they wanted in the “new b3”. It was a very productive discussion! The next User Forum will be…
Where have all the CCDs gone?
BycorieDuring the January shutdown, we decided to test the two Q315R detectors that used to live in beamlines 5.0.1 and 5.0.2. Fortunately, they still work! Once Gemini is commissioned (at the end of this year, if all goes well) then we will have to take the Pilatus out of 5.0.1 and move it over to Gemini. Therefore, good to know that the Q315R is still good. Here it is being tested on the floor at 5.0.1.
The User Forum continues…
BycorieOur second User Forum was on March 4, in which we discussed the purchase of a pixel-array detector for beamline 5.0.2. The exciting news since then is that we will be able to purchase a Pilatus 6M for the beamline. Expected delivery is in September of this year.
The third User Forum was on April 2, in which we discussed the diode-beamstop device which the BCSB is developing (allows measurement of flux during data collection), as well as the MiniKappa interlocks on beamline 5.0.2, which will now allow a full 360 rotation of omega (sometimes called Phi) with a maximum kappa angle of 55 degrees.
Scientific Advisory Board First Meeting Sept 18 2015
BycorieWe are very fortunate to have an outstanding Scientific Advisory Board for the new beamline (“Gemini”) we are building in sector 2 at the ALS. The board members are: Bob Fischetti (APS), Dan Harrington (SSRL), Gwyndaf Evans (Diamond Light Source) and Dan Harrington (SSRL). All of the committee members have extensive experience in building microfocus…