Similar Posts
Where have all the CCDs gone?
BycorieDuring the January shutdown, we decided to test the two Q315R detectors that used to live in beamlines 5.0.1 and 5.0.2. Fortunately, they still work! Once Gemini is commissioned (at the end of this year, if all goes well) then we will have to take the Pilatus out of 5.0.1 and move it over to Gemini. Therefore, good to know that the Q315R is still good. Here it is being tested on the floor at 5.0.1.
Biosciences Workshop Planned for Feb 13
BycorieThe Advanced Light Source is planning a major upgrade, which will result in brighter, more coherent beams. The upgrade will occur in 4-5 years, and so now is the time for the biosciences community to define our vision of synchrotron capabilites for biosciences (scattering, diffraction, tomography and IR methods) in the years to come, and…
Welcome to Daniil!
BycorieWe are very pleased to now have Daniil Prigozhin in the BCSB. He comes to us with a strong background in crystallography, both growing crystals and solving structures. He completed his PhD work with Dr. Tom Alber at UC Berkeley in 2014, then did a post-doc with Dr. Yorgo Modis at the University of Cambridge,…
Back up and running
BycorieWe are back up from the long ALS shutdown, and the beamlines are in good shape. We completed a number of projects on the sector 5 beamlines, in particular, as well as performed maintenance on a number of systems: – Pilatus3 6M installed on 5.0.1. The install went well, and tests with x-rays show that…
First User Forum Feb 5
BycorieThe BCSB had its first User Forum meeting on Feb 5. We discussed the possibilities for the new b3 software interface, showed some screenshots of new the new interface, and gathered information from our users on what they wanted in the “new b3”. It was a very productive discussion! The next User Forum will be…