Similar Posts
Back up and running
BycorieWe are back up from the long ALS shutdown, and the beamlines are in good shape. We completed a number of projects on the sector 5 beamlines, in particular, as well as performed maintenance on a number of systems: – Pilatus3 6M installed on 5.0.1. The install went well, and tests with x-rays show that…
Beamline 8.2.1 just deposited its 1000th structure
BycorieCongrats, beamline 8.2.1!
Pin base warmer looking good
BycorieWe measured the temperature at the sample during warming of the pin base, and preliminary tests so far show that the heat is not transferred to the loop during two minutes of base warming. Tests are continuing now to determine how well the warmer removes ice and frost from the bases.
Images of a crystal in a loop before and after using the pin base warmer:





