Similar Posts
Back up and running
BycorieWe are back up from the long ALS shutdown, and the beamlines are in good shape. We completed a number of projects on the sector 5 beamlines, in particular, as well as performed maintenance on a number of systems: – Pilatus3 6M installed on 5.0.1. The install went well, and tests with x-rays show that…
Pin base warmer is coming along…
BycorieAnthony installed the first pin base warmer on 5.0.2 today. We have to wait until the ALS has LN restored before we can test it. One thing to note: the people we spoke to at NE-CAT about their pin base warmer told us that it does not actually solve the icing issue completely. They still do see pins move on the goniometer after mounting. Hopefully the warmer will help a bit, though!
Pilatus on 5.0.2 has two new modules
BycorieDectris was here at the ALS during the recent 2-bunch mode, and re-installed two of the modules on the Pilatus detector on beamline 5.0.2. Users may not have noticed, but the detector was previously missing panels on the far edges. These are now in good working order, and several test data sets have been collected…
BCSB User Forum
BycorieThe BCSB is planning on starting a monthly User Forum to solicit feedback from users on the current and future use of the beamlines. We’d love to hear from you about the direction that the BCSB should be taking in terms of beamline upgrades, features, and general operations. If you are interested in participating in the forum, please contact Corie Ralston.