Beamline 8.2.1 just deposited its 1000th structure
Congrats, beamline 8.2.1!
Congrats, beamline 8.2.1!
We measured the temperature at the sample during warming of the pin base, and preliminary tests so far show that the heat is not transferred to the loop during two minutes of base warming. Tests are continuing now to determine how well the warmer removes ice and frost from the bases.
Images of a crystal in a loop before and after using the pin base warmer:
The BCSB is planning on starting a monthly User Forum to solicit feedback from users on the current and future use of the beamlines. We’d love to hear from you about the direction that the BCSB should be taking in terms of beamline upgrades, features, and general operations. If you are interested in participating in the forum, please contact Corie Ralston.