Similar Posts
Pin base warmer is coming along…
BycorieAnthony installed the first pin base warmer on 5.0.2 today. We have to wait until the ALS has LN restored before we can test it. One thing to note: the people we spoke to at NE-CAT about their pin base warmer told us that it does not actually solve the icing issue completely. They still do see pins move on the goniometer after mounting. Hopefully the warmer will help a bit, though!

BCSB represented at the ACA in New Orleans
BycorieOnce again, the BCSB teamed up with several other groups at the ALS to host a booth at the ACA. It was great to hang out with our ALS colleagues and to see many of our users.
Berkeley’s Mini-Cyclotron
BycorieIt turns out there is a small cyclotron at LBNL! It is used to produce medical isotopes used for PET scans. Some of the BCSB staff were lucky enough to be invited on a tour of the cyclotron, which is in building 56, not too far away from our more familiar synchrotron in building 6.
Back up and running
BycorieWe are back up from the long ALS shutdown, and the beamlines are in good shape. We completed a number of projects on the sector 5 beamlines, in particular, as well as performed maintenance on a number of systems: – Pilatus3 6M installed on 5.0.1. The install went well, and tests with x-rays show that…
Welcome to Daniil!
BycorieWe are very pleased to now have Daniil Prigozhin in the BCSB. He comes to us with a strong background in crystallography, both growing crystals and solving structures. He completed his PhD work with Dr. Tom Alber at UC Berkeley in 2014, then did a post-doc with Dr. Yorgo Modis at the University of Cambridge,…


