Similar Posts
Shutdown work in progress
BycorieALS is down for the month of July and the first week or so of August. We are taking the opportunity to do a bunch of preventative maintenance on our beamlines. Some of the items include: – cleaning the Be window on 502 (may help to decrease scatter in images) – replacing air lines –…
Pin base warmer looking good
BycorieWe measured the temperature at the sample during warming of the pin base, and preliminary tests so far show that the heat is not transferred to the loop during two minutes of base warming. Tests are continuing now to determine how well the warmer removes ice and frost from the bases.
Images of a crystal in a loop before and after using the pin base warmer:
Welcome to Daniil!
BycorieWe are very pleased to now have Daniil Prigozhin in the BCSB. He comes to us with a strong background in crystallography, both growing crystals and solving structures. He completed his PhD work with Dr. Tom Alber at UC Berkeley in 2014, then did a post-doc with Dr. Yorgo Modis at the University of Cambridge,…
BCSB User Forum
BycorieThe BCSB is planning on starting a monthly User Forum to solicit feedback from users on the current and future use of the beamlines. We’d love to hear from you about the direction that the BCSB should be taking in terms of beamline upgrades, features, and general operations. If you are interested in participating in the forum, please contact Corie Ralston.





