Similar Posts
BCSB User Forum
BycorieThe BCSB is planning on starting a monthly User Forum to solicit feedback from users on the current and future use of the beamlines. We’d love to hear from you about the direction that the BCSB should be taking in terms of beamline upgrades, features, and general operations. If you are interested in participating in the forum, please contact Corie Ralston.
Where have all the CCDs gone?
BycorieDuring the January shutdown, we decided to test the two Q315R detectors that used to live in beamlines 5.0.1 and 5.0.2. Fortunately, they still work! Once Gemini is commissioned (at the end of this year, if all goes well) then we will have to take the Pilatus out of 5.0.1 and move it over to Gemini. Therefore, good to know that the Q315R is still good. Here it is being tested on the floor at 5.0.1.
The User Forum continues…
BycorieOur second User Forum was on March 4, in which we discussed the purchase of a pixel-array detector for beamline 5.0.2. The exciting news since then is that we will be able to purchase a Pilatus 6M for the beamline. Expected delivery is in September of this year.
The third User Forum was on April 2, in which we discussed the diode-beamstop device which the BCSB is developing (allows measurement of flux during data collection), as well as the MiniKappa interlocks on beamline 5.0.2, which will now allow a full 360 rotation of omega (sometimes called Phi) with a maximum kappa angle of 55 degrees.



