Back up and running
BycorieWe are back up from the long ALS shutdown, and the beamlines are in good shape. We completed a number of projects on the sector 5 beamlines, in particular, as well as performed maintenance on a number of systems: – Pilatus3 6M installed on 5.0.1. The install went well, and tests with x-rays show that…
The User Forum continues…
BycorieOur second User Forum was on March 4, in which we discussed the purchase of a pixel-array detector for beamline 5.0.2. The exciting news since then is that we will be able to purchase a Pilatus 6M for the beamline. Expected delivery is in September of this year.
The third User Forum was on April 2, in which we discussed the diode-beamstop device which the BCSB is developing (allows measurement of flux during data collection), as well as the MiniKappa interlocks on beamline 5.0.2, which will now allow a full 360 rotation of omega (sometimes called Phi) with a maximum kappa angle of 55 degrees.