Category Archives : Operations

Tour of the ALS ring

On November 17, 2015, Posted by , In Operations,Social, With Comments Off on Tour of the ALS ring

After our last PRT meeting on Nov 4, Steve Rossi took a group on a tour inside the ALS ring to point out the future site of the Gemini insertion device. This month and next are a great time to visit the ALS, since the ring tunnel is open and available for touring.

Gemini_tour_Nov_2015

The Pilatus 6M detector has arrived!

On September 23, 2015, Posted by , In Operations, With Comments Off on The Pilatus 6M detector has arrived!

Here it is at beamline 5.0.2, unpacked from the wooden crate, but not unpacked from its case yet. Install and commissioning in the beamline will begin in just a few weeks!

Pilatus6M 

Scientific Advisory Board First Meeting Sept 18 2015

On September 22, 2015, Posted by , In Operations, With Comments Off on Scientific Advisory Board First Meeting Sept 18 2015

We are very fortunate to have an outstanding Scientific Advisory Board for the new beamline (“Gemini”) we are building in sector 2 at the ALS. The board members are: Bob Fischetti (APS), Dan Harrington (SSRL), Gwyndaf Evans (Diamond Light Source) and Dan Harrington (SSRL). All of the committee members have…

BCSB Represented at the ACA in Philly

On July 22, 2015, Posted by , In Operations,Social, With Comments Off on BCSB Represented at the ACA in Philly

The BCSB had a good showing at the ACA in Philadelphia this year. Dr. Banu Sankaran ran a session on service crystallography, and the BCSB teamed up with other ALS scientists to run a booth at the conference.
ACA2015 

The User Forum continues…

On April 9, 2015, Posted by , In Operations, With Comments Off on The User Forum continues…

Our second User Forum was on March 4, in which we discussed the purchase of a pixel-array detector for beamline 5.0.2. The exciting news since then is that we will be able to purchase a Pilatus 6M for the beamline. Expected delivery is in September of this year.

The third User Forum was on April 2, in which we discussed the diode-beamstop device which the BCSB is developing (allows measurement of flux during data collection), as well as the MiniKappa interlocks on beamline 5.0.2, which will now allow a full 360 rotation of omega (sometimes called Phi) with a maximum kappa angle of 55 degrees.

First User Forum Feb 5

On February 13, 2015, Posted by , In Operations, With Comments Off on First User Forum Feb 5

The BCSB had its first User Forum meeting on Feb 5. We discussed the possibilities for the new b3 software interface, showed some screenshots of new the new interface, and gathered information from our users on what they wanted in the “new b3”. It was a very productive discussion! The…

BCSB User Forum

On December 4, 2014, Posted by , In Operations, With Comments Off on BCSB User Forum

The BCSB is planning on starting a monthly User Forum to solicit feedback from users on the current and future use of the beamlines. We’d love to hear from you about the direction that the BCSB should be taking in terms of beamline upgrades, features, and general operations. If you are interested in participating in the forum, please contact Corie Ralston.

The First Day of Shutdown

On May 6, 2014, Posted by , In Operations, With Comments Off on The First Day of Shutdown

wall_o_dewarsThese are the dewars that shipped on Monday May 5, the first day of the ALS shutdown. Thirty of those are from the BCSB beamlines!