{"id":354,"date":"2026-10-14T16:07:54","date_gmt":"2026-10-14T23:07:54","guid":{"rendered":"https:\/\/bcsb.als.lbl.gov\/?page_id=354"},"modified":"2026-10-14T16:16:04","modified_gmt":"2026-10-14T23:16:04","slug":"how-to-get-beamtime-2","status":"publish","type":"page","link":"https:\/\/bcsb.als.lbl.gov\/?page_id=354","title":{"rendered":"How to Get Beamtime"},"content":{"rendered":"\n<p class=\"alignwide wp-block-paragraph\"><strong>Getting beamtime is easier than it looks.<\/strong> Not sure where to start? Email us at <strong>BCSBBeamtime@lbl.gov<\/strong>, tell us a little about your project, and we\u2019ll help you find the right option and get you on the schedule.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">Prefer to browse? Here are all the ways to get time on the beamlines at the Berkeley Center for Structural Biology (BCSB). Find your situation in the table below, then see that section for details.<\/p>\n\n\n\n<figure class=\"wp-block-table alignwide\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>If you\u2026<\/strong><\/td><td><strong>Choose<\/strong><\/td><td><strong>Proposal needed?<\/strong><\/td><td><strong>Amount of time<\/strong><\/td><td><strong>Timing<\/strong><\/td><\/tr><tr><td>Are an HHMI Investigator<\/td><td>HHMI Investigator Time<\/td><td>No<\/td><td>Up to 6 shifts per request (9 if non-local)<\/td><td>Email the scheduler any time<\/td><\/tr><tr><td>Need a short experiment, fast<\/td><td>RAPIDD<\/td><td>Yes<\/td><td>Up to 3 shifts per proposal<\/td><td>Submit anytime; answer in 2-3 weeks<\/td><\/tr><tr><td>Want an ongoing program, or a larger experiment<\/td><td>General User Proposal<\/td><td>Yes<\/td><td>More than 3 shifts<\/td><td>Two deadlines per year<\/td><\/tr><tr><td>Want guaranteed, priority access<\/td><td>Participating Research Team<\/td><td>No (purchase)<\/td><td>Reserved, ongoing<\/td><td>Contact us<\/td><\/tr><tr><td>Want expert staff to collect and process data for you<\/td><td>Collaborative Crystallography<\/td><td>Yes (through GUP or RAPIDD)<\/td><td>Per approved proposal<\/td><td>Same as GUP or RAPIDD<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading alignwide\"><strong>Before You Start (All Users)<\/strong><\/h3>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">New users must complete a proprietary and\/or non-proprietary user agreement before using the beamlines. Proprietary users must also provide advance funding for their beamtime. Not sure which applies to you? See our Proprietary\/Non-proprietary page <a href=\"https:\/\/bcsb.als.lbl.gov\/proprietary-and-non-proprietary-beamtime\/\"><\/a>[add link].<\/p>\n\n\n\n<h3 class=\"wp-block-heading alignwide\"><strong>HHMI Investigator Time<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>For:<\/strong> HHMI Investigators. <strong>Beamlines:<\/strong> 8.2.1, 8.2.2 and 2.0.1. <strong>No proposal required.<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Check the BUDS schedule [add link] for open shifts.<\/li>\n\n\n\n<li>Email your requested dates to the BCSB Scheduler: BCSBBeamtime@lbl.gov.<\/li>\n<\/ol>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>Limits:<\/strong> Up to 6 shifts per request, or 9 for non-local users. Additional time may be granted in special circumstances with the beamline scientist\u2019s approval.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>The 72-hour rule:<\/strong> Open HHMI shifts are held for Investigators until 72 hours before the start of beamtime. After that, any user can book them on a first-come, first-served basis.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>New to the HHMI beamlines?<\/strong> We invite new HHMI Investigators to try them out. Email the scheduler and we will help you get started. You will need a non-proprietary user agreement in place before your first shift.<\/p>\n\n\n\n<h3 class=\"wp-block-heading alignwide\"><strong>RAPIDD: Rapid Access<\/strong><\/h3>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>For:<\/strong> Users who need limited beamtime quickly. <strong>Amount:<\/strong> Up to 3 shifts per proposal.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">Submit a proposal through the ALS at any time. You will hear back in 2-3 weeks. [Add link to RAPIDD submission page.]<\/p>\n\n\n\n<h3 class=\"wp-block-heading alignwide\"><strong>General User Proposal (GUP)<\/strong><\/h3>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>For:<\/strong> Users who want to establish an ongoing program of work at the Advanced Light Source (ALS), or carry out a single experiment that needs more than the 3 shifts RAPIDD allows.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">Proposals cover a 6-month period. There are two deadlines each year:<\/p>\n\n\n\n<figure class=\"wp-block-table alignwide\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Operating cycle<\/strong><\/td><td><strong>Proposal deadline<\/strong><\/td><\/tr><tr><td>January-July<\/td><td>First Wednesday in September<\/td><\/tr><tr><td>August-December<\/td><td>First Wednesday in March<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Next deadline:<\/strong> [March 3, 2027. Verify against the ALS calendar.]<\/p>\n\n\n\n<h3 class=\"wp-block-heading alignwide\"><strong>Participating Research Team (PRT)<\/strong><\/h3>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>For:<\/strong> Companies and academic groups that want reserved beamtime on an ongoing basis.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">PRT members have purchased beamtime on the sector 5 beamlines (5.0.1, 5.0.2, and 5.0.3). PRT members receive priority over general users and may at any time ask to be moved to the top of the waiting list for cancelled or unused time.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>Requirements:<\/strong> Fully executed ALS user agreements must be in place before beamtime. PRT funding, and any applicable proprietary funding, must be received by LBNL at least five business days before beamtime.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>Interested?<\/strong> Contact Daniil Prigozhin (<strong>DaniilPrigozhin@lbl.gov<\/strong>) or Stacey Ortega (<strong>SLOrtega@lbl.gov<\/strong>).<\/p>\n\n\n\n<h3 class=\"wp-block-heading alignwide\"><strong>Collaborative Crystallography<\/strong><\/h3>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>For:<\/strong> Non-proprietary academic users of the sector 5 beamlines, from beginners to experts, who want more extended service.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">You send crystals to an expert crystallographer on our staff, who collects and processes the data. They can also solve structures and help write journal articles.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>How to join:<\/strong> Submit a proposal through GUP or RAPIDD. Approval there must come first.<\/p>\n\n\n\n<hr class=\"wp-block-separator aligncenter has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading alignwide\"><strong>Frequently Asked Questions<\/strong><\/h3>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>Do I need to submit a proposal?<\/strong><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">It depends on the option. HHMI Investigators and Participating Research Teams do not submit proposals. RAPIDD, General User Proposals, and Collaborative Crystallography do.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>What is the difference between RAPIDD and a General User Proposal?<\/strong><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">RAPIDD is for limited, quick access of up to 3 shifts per proposal. You can submit anytime and hear back in 2-3 weeks. A General User Proposal (GUP) is for ongoing programs of work, or single experiments that need more than 3 shifts. GUPs cover a 6-month period and have two deadlines per year.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>When are the General User Proposal deadlines?<\/strong><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">The first Wednesday of September for the January-July cycle, and the first Wednesday of March for the August-December cycle. [Next deadline: March 3, 2027. Verify against the ALS calendar.]<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>How long does it take to hear back?<\/strong><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">RAPIDD results take 2-3 weeks. [GUP decision timeline: add here.]<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>What is a \u201cshift\u201d?&nbsp; Can I run \u00bd shift?<\/strong><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">A shift is 8 hours.&nbsp; Yes, you can run \u00bd shift which is 4 hours.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>What do I need to do before my first beamtime?<\/strong><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">New users must complete a proprietary and\/or non-proprietary user agreement. Proprietary users must also provide advance funding for their beamtime. See our Proprietary\/Non-proprietary page [add link] to find out which applies to you.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>I\u2019m an HHMI Investigator. How do I book time?<\/strong><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">Check the BUDS schedule [add link] for open shifts on beamlines 8.2.1 and 8.2.2, then email your requested dates to the BCSB Scheduler at <strong>BCSBBeamtime@lbl.gov<\/strong>. No proposal is needed.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>How many shifts can I request as an HHMI Investigator?<\/strong><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">Up to 6 shifts per request, or up to 9 for non-local users. Additional time may be granted in special circumstances with the beamline scientist\u2019s approval.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>What is the 72-hour rule?<\/strong><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">Open HHMI shifts are held for HHMI Investigators until 72 hours before the start of beamtime. If they haven\u2019t been reserved by then, they are released to any user on a first-come, first-served basis.&nbsp;<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>I\u2019m a new HHMI Investigator. Can I try the HHMI beamlines?<\/strong><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">Yes. Email your request to the BCSB Scheduler (<strong>BCSBBeamtime@lbl.gov<\/strong>) and we will help you get started. You will need a non-proprietary user agreement in place before your beamtime begins.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>What is a Participating Research Team (PRT), and how do I join?<\/strong><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">PRT members are companies or academic groups that have purchased beamtime on the sector 5 beamlines (5.0.1, 5.0.2, and 5.0.3). They get priority over general users and can ask to be moved to the top of the waiting list for cancelled or unused time. PRT funding must reach LBNL at least 5 business days before beamtime. To join, contact Daniil Prigozhin (<strong>DaniilPrigozhin@lbl.gov<\/strong>) or Stacey Ortega (<strong>SLOrtega@lbl.gov<\/strong>).<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>What is Collaborative Crystallography?<\/strong><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">It is a program for non-proprietary academic users, from beginners to experts. You send crystals to an expert crystallographer on our staff, who collects and processes the data.&nbsp;<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>How do I join Collaborative Crystallography?<\/strong><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">Submit a proposal through GUP or RAPIDD. Approval there must come first.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>How do I cite the BCSB in my publications?<\/strong><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">See the \u201cCiting the BCSB\u201d section below for the acknowledgment text. Beamlines 2.0.1 and 5.0.1 have extra detector funding statements to include.<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>Who do I contact with other questions?<\/strong><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">Email <strong>BCSBBeamtime@lbl.gov<\/strong> and we\u2019ll point you in the right direction. For PRT membership, contact Daniil Prigozhin or Stacey Ortega (see above).<\/p>\n\n\n\n<h2 class=\"wp-block-heading alignwide\">Citing the BCSB<\/h2>\n\n\n\n<p class=\"alignwide wp-block-paragraph\">Please include the following in your publications:<\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>The Berkeley Center for Structural Biology is supported by the Howard Hughes Medical Institute, Participating Research Team members, and the National Institutes of Health, National Institute of General Medical Sciences, ALS-ENABLE grant P30 GM124169. The Advanced Light Source is a Department of Energy Office of Science User Facility under Contract No. DE-AC02-05CH11231.<\/strong><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>Using beamline 2.0.1?<\/strong> Add: <em>The Eiger detector on beamline 2.0.1 was funded under NIH grant 1S10OD032212.<\/em><\/p>\n\n\n\n<p class=\"alignwide wp-block-paragraph\"><strong>Using beamline 5.0.1?<\/strong> Add: <em>The Pilatus detector on beamline 5.0.1 was funded under NIH grant S10OD026941.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Getting beamtime is easier than it looks. Not sure where to start? Email us at BCSBBeamtime@lbl.gov, tell us a little about your project, and we\u2019ll help you find the right option and get you on the schedule. Prefer to browse? Here are all the ways to get time on the beamlines at the Berkeley Center&hellip; <a class=\"more-link\" href=\"https:\/\/bcsb.als.lbl.gov\/?page_id=354\">Continue reading <span class=\"screen-reader-text\">How to Get Beamtime<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-354","page","type-page","status-publish","hentry","entry"],"_links":{"self":[{"href":"https:\/\/bcsb.als.lbl.gov\/index.php?rest_route=\/wp\/v2\/pages\/354","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bcsb.als.lbl.gov\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/bcsb.als.lbl.gov\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/bcsb.als.lbl.gov\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/bcsb.als.lbl.gov\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=354"}],"version-history":[{"count":3,"href":"https:\/\/bcsb.als.lbl.gov\/index.php?rest_route=\/wp\/v2\/pages\/354\/revisions"}],"predecessor-version":[{"id":362,"href":"https:\/\/bcsb.als.lbl.gov\/index.php?rest_route=\/wp\/v2\/pages\/354\/revisions\/362"}],"wp:attachment":[{"href":"https:\/\/bcsb.als.lbl.gov\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=354"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}